A. The main renovation works are listed below: (View the completion certificates)
> Drylined & insulated the property
> Increased size of hallway by removing one existing bedroom
> Constructed new custom staircase in hallway to enable access to upper level
> Transformed 3 of the pre-existing rooms into one large kitchen/dining/family room
> Removed staircase from what is now the kitchen/dining/family room
> Constructed master bedroom with en-suite bathroom
> Constructed inner hall that leads to master bedroom & en-suite bathroom
> Removed existing bathroom and converted into an office. Currently now shelved and used as a Storeroom
> Upstairs, constructed a family bathroom, additional bedroom 2, in-built cupboards and under eaves storage.
> Removed all timber cladding from all walls and ceiling in bedroom 2 and created a raised arched ceiling.
> Installed 9 velux windows in upper level (six in bedroom 2, one in hall, one in bedroom 3, and one in bathroom)
B. Other more recent works & improvements include:
> Replaced the following windows with custom-built double-glazed high-spec security hardwood units:
kitchen (2No), lounge (1No), entrance hall (1No), main bedroom (4No), sunroom (all)
> New pantiled roof
> Replaced sunroom felt roof with GRP roof (October 2017)
> Storeroom & rear hall windows: installed custom-built double-glazed high-spec security hardwood units (Apr'19)
> Timber store/workshop: front and rear elevations recladded (December 2019)
> All render around sunroom & rear hall removed and replaced (Autumn 2021)
> Overhaul of main slate roof (Autumn 2021)
> Hardwood baseboards & guttering installed under front elevation pantile roof (Autumn 2021)
> Gable above sunroom & en-suite repointed and 2 very worn coping stones removed and replaced (Autumn 2021)
> All chimneys and sections of stonework repointed (Autumn 2021)
> Replacement of damaged/desurfaced coping stone on western gable (November 2022)
> Repair and make safe the sagging/cracked joists within the Stone Bothy (February 2023)
> Drylined & insulated the property
> Increased size of hallway by removing one existing bedroom
> Constructed new custom staircase in hallway to enable access to upper level
> Transformed 3 of the pre-existing rooms into one large kitchen/dining/family room
> Removed staircase from what is now the kitchen/dining/family room
> Constructed master bedroom with en-suite bathroom
> Constructed inner hall that leads to master bedroom & en-suite bathroom
> Removed existing bathroom and converted into an office. Currently now shelved and used as a Storeroom
> Upstairs, constructed a family bathroom, additional bedroom 2, in-built cupboards and under eaves storage.
> Removed all timber cladding from all walls and ceiling in bedroom 2 and created a raised arched ceiling.
> Installed 9 velux windows in upper level (six in bedroom 2, one in hall, one in bedroom 3, and one in bathroom)
B. Other more recent works & improvements include:
> Replaced the following windows with custom-built double-glazed high-spec security hardwood units:
kitchen (2No), lounge (1No), entrance hall (1No), main bedroom (4No), sunroom (all)
> New pantiled roof
> Replaced sunroom felt roof with GRP roof (October 2017)
> Storeroom & rear hall windows: installed custom-built double-glazed high-spec security hardwood units (Apr'19)
> Timber store/workshop: front and rear elevations recladded (December 2019)
> All render around sunroom & rear hall removed and replaced (Autumn 2021)
> Overhaul of main slate roof (Autumn 2021)
> Hardwood baseboards & guttering installed under front elevation pantile roof (Autumn 2021)
> Gable above sunroom & en-suite repointed and 2 very worn coping stones removed and replaced (Autumn 2021)
> All chimneys and sections of stonework repointed (Autumn 2021)
> Replacement of damaged/desurfaced coping stone on western gable (November 2022)
> Repair and make safe the sagging/cracked joists within the Stone Bothy (February 2023)