| SUMMARY OF RENOVATION WORKS

A. The main renovation works are listed below: (View the completion certificates)

>   Drylined & insulated the property
>   Increased size of hallway by removing one existing bedroom
>   Constructed new custom staircase in hallway to enable access to upper level
>   Transformed 3 of the pre-existing rooms into one large kitchen/dining/family room
>   Removed staircase from what is now the kitchen/dining/family room
>   Constructed master bedroom with en-suite bathroom
>   Constructed inner hall that leads to master bedroom & en-suite bathroom
>   Removed existing bathroom and converted into an office. Currently now shelved and used as a Storeroom
>   Upstairs, constructed a family bathroom, additional bedroom 2, in-built cupboards and under eaves storage.
>   Removed all timber cladding from all walls and ceiling in bedroom 2 and created a raised arched ceiling.
>   Installed 9 velux windows in upper level (six in bedroom 2, one in hall, one in bedroom 3, and one in bathroom)

B. Other more recent works & improvements include:

>   Replaced the following windows with custom-built double-glazed high-spec security hardwood units:
     kitchen (2No), lounge (1No), entrance hall (1No), main bedroom (4No), sunroom (all)
>   New pantiled roof
>   Replaced sunroom felt roof with GRP roof (October 2017)
>   Storeroom & rear hall windows: installed custom-built double-glazed high-spec security hardwood units (Apr'19)
>   Timber store/workshop: front and rear elevations recladded (December 2019)
>   All render around sunroom & rear hall removed and replaced (Autumn 2021)
>   Overhaul of main slate roof (Autumn 2021)
>   Hardwood baseboards & guttering installed under front elevation pantile roof (Autumn 2021)
>   Gable above sunroom & en-suite repointed and 2 very worn coping stones removed and replaced (Autumn 2021)
>   All chimneys and sections of stonework repointed (Autumn 2021)
>   Replacement of damaged/desurfaced coping stone on western gable (November 2022)
>   Repair and make safe the sagging/cracked joists within the Stone Bothy (February 2023)